Forum Home | Profile | Active Topics | Members | Search | FAQ
Username:  Password: 
Save Password
Forgot your Password?
 All Forums
 GMSC Administration
 Club House Refurbishment
 Planned Activities and Work in Progress

Note: You must be registered in order to post a reply.

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

  Check here to include your profile signature.
Check here to subscribe to this topic.
    

T O P I C    R E V I E W
TonyGreen Posted - 11/05/2005 : 21:19:33
We will keep this page updated with planned activities on the project.

>> View Pictures of progress here...

Next Sessions -

TBA due to work at home!

- see below for specific tasks



The deck is in and handrail in place some finishing touches required. New gutters, fascias and cladding of the clubhouse have been completed, completion of the access toilet will be the next major push.
The key tasks are:
  • Inside
  • Finish work in lady's changing room
  • Box in plumbing
  • Work on making new picnic tables
  • Outside
  • Pipework round rain water collection
  • Replace gutter on Drott shed
  • Work on outside washup sinks

Please contact me by this link or at premises@greatmoor.org.uk or via the contacts page of this website if you are able to help with the continuing work on the clubhouse. Keep an eye on this listing and we will be pleased to accept your help for any of the tasks listed.

If you can't make the planned sessions we can find a task for you to do at other times!

Order reversed so new items at the top!

TBA 2010 @ 18:30
Connect up weather station
Work on new picnic tables
Clean up handrail on deck and treat with Teak Oil
Improve fittings in cleaners cupboard
Work on rainwater collection system
Continue boxing pipes in men's
Continue boxing pipes in lady's
Clean office door

Wednesday April 14th 2010
Pulled through a cable for the weather station
Some more work on the new picnic tables


Wednesday April 7th
Worked on new picnic tables

Wednesday March 31st
Worked on ramp for mirror jetty
Worked on new picnic tables

Wednesday March 24th 2010
Worked on new picnic tables

Wednesday March 17th 2010
Fixed frame for storing tables in clubroom cupboard
Worked on new picnic tables


Wednesday March 10th 2010
Fixed 3 bird nest boxes to drott shed
Re-fix microwave brackets for new microwave
Replace seal for door glass on wood stove



Wednesday April 8th 2009 @ 18:30
Move freezers to bar container
Install more ventilation ducting above men's changing room
Paint weather rail on main door
+ other

Wednesday April 1st
Rub down and oil new doors in clubroom
Routed new cable into Drott shed
Measured up some items for futere tasks
Changed PIR on lighting in men's changing room



Wednesday March 25th
Connected power to Bar container ready for freezers to move back
Connected extractor fan in Men's
Fitted 4th loud speaker on wall in clubroom


Sunday March 22nd
Connected cable to bar container
Filled round weather strip on main clubhouse door

Friday March 20th
Fitted new threshold strip on main door to clubhouse
Modified base of main door to clubhouse

Wednesday March 18th
Filled some holes and in plasterwork
Filling round ducts in men's changing room wall
Painted part of wall in men's changing room
Connected cable to fan in men's

Tuesday March 17th
Tidy up round lower steps to lowest trott

Friday March 13th
Helped load some surplus items sold on e-bay
Isolated problem with phone wiring
Printed missing renewal invitations


Friday March 6th
Finished gutter at rear of bar
Finished work on stove
Loaded more scrap metal in the skip


Wednesday March 4th
Printed membership renewal invitation letters



Wednesday February 25th @ 18:30
Continued assembly of ramp for main jetty
Measured up and other prep. for work day materials

Wednesday February 18th
Constructed a stand for new folding tables
Started assembly of ramp for main jetty
Some measuring up


Wednesday February 4th
Some work on electrics
Started testing Electrical Installation


Wednesday January 21st
Some work on electrics


Wednesday January 7th
Did some small maintenance tasks
Unloaded pontoon ramp from Dave's van


Saturday December 13th
Windowsill installed in Lady's
More boxing round plumbing and ducting in Lady's
Ventilation duct started in Men's
#5 buoy replaced
Tarpaulin cover on portacabin fitted


Friday December 12th
Work on tiling in lady's

Wednesday December 10th
Continued work on woodstore


Friday November 28th
Cladding of back wall and Southern end of clubhouse completed
Fascia at back of clubbhouse in place
Fixed key box to wall

Wednesday November 26th
Continued cladding
Continued work on new wood store

Sunday November 23rd
Completed woodstore roof

Friday November 21st
Constructed woodstore roof and partly covered

Wednesday November 19th
Continued cladding

Monday November 17th
The contractors installed the gas heater in the lady's changing room
Did some work on new wood store

Saturday 1st November Workday
Prepared and ate lunch
Clear area by small wood store ready for gas heater install in lady's
Moved bar container to new location
Fitted gutter to front of Clubhouse
Improved hand rail at top of steps
More cladding on north end of clubhouse
Completed concrete work around new pontoon ramp
Cleaned out freezer, fridge and cupboards in galley
Fitted new terminal guards on heater ports
Formed bases for new wood store and cemented in place
Cleared up where bar store has moved from
Replaced #3 buoy
Replaced faulty emergency light in men's changing room
Put pea shingle round new concrete



Friday October 31st @ 10:30
Continued installing ventilation ducting in lady's
Continued install of cladding
Installed new fascia on front of Clubhouse
Installed external sockets on clubhouse front wall
Modified internal wiring on bar container

Thursday 28th day
Assist Pioneers
Continue cladding

Wednesday October 29th
Measured up and prep for workday 1st Nov

Wednesday 28th day
Assist Pioneers
Continue cladding

Tuesday 27th day
Assist Pioneers
Start cladding


Friday October 24th
Some preparation for cladding
Assist pioneers with concreting
Construct shuttering for new pontoon mooring
Unload featherboard for cladding

Wednesday October 22nd
Continued installing ventilation ducting in lady's

Wednesday October 15th @ 18:30
Continued installing ventilation ducting in lady's
Measured up for detail of cladding
Continued battening outside walls for cladding
Did some planning for Pioneer work 20th onwards

Saturday October 11th
Grass cut around entrance
Some berths tidied up
Temporary pergola taken down
New gutter fixed to front of clubhouse
10t shingle spread in car park
Last of the spindles fixed round the deck
Extractor fan installed in lady's (hole through wall and temporary wired to lights)
Cabling run for external sockets and lighting on front of clubhouse
Base of flagpole repaired
Deck boards of phase 2 trimmed to length and ends treated
Base of water tanks treated
3 kestrels upgraded
Lunch eaten (thanks Sandy)
Some more battens fixed to front of clubhouse
Willow rings moved
Hawthorn tree next to steps pruned
Race board stand repaired
Removed old gutter around men's changing room
Investigated fascia above office door
and ....

Friday October 10th
Last of spindles for deck finished

Wednesday October 8th
Installed wall plate for projector connection and tested
Checked faulty emergency light - its faulty
Found clamps for fencing
Planned some materials for Saturday

Friday pm October 3rd
Fixed last two sections of bottom rail of decking edge
Finished some more bars for deck rail and installed 36 more (that's about 130 so far)!
Removed last of Harris fence panels from edge of decking

Wednesday Evening October 1st
Base for heater in lady's in place and coat of primer
Duct for ventilation fitted in lady's
Some of the plumbing coverd in the men's
Remaining bars for deck railings rut to size
Kestrel turned over in Drott shed

Wednesday Evening September 24th
Finished and fixed some more bars on the decking handrail

Friday Evening September 19th
Completed fitting decking handrail along remaining of deck front
First section of bars under deck rail inserted

Wednesday Evening September 17th
Some wood cut for decking handrail

Saturday 13th September
The rest of the deck structure in and boards in place - a long day - but its in!
Top of handrail fitted

Friday 12th September 15:00
The next beam was fixed in place with some joists and hangers in place

Saturday 6th September (workday)
Dug trench for cable to new bar container location
Car park leveled
Drainage channel dug
Cable duct put in place
Another 2.4m of deck built
Some work on new wood store

Friday 5th September
Started structure for phase 2 decking
Started constructing base for heater in lady's

Tuesday 2nd September
Dug drainage channels in area of phase 2 decking and filled with pea shingle
Dodged the showers

Monday 1st September
Malcolm built new casing for manhole cover to drains

Tuesday 26th August
Did some clearing up of demolished portacabins

Sunday 24th August
Located IBCs on newly constructed pad


Tuesday 19th August
Put up the second section of shelf in the lady's

Wednesday 9th August
Started on the urinal flush control
Raining so no outdoor tasks done

Tuesday 1st July
Fitted handrails and did some other finishing work on and around decking
Painted timber work around urinals in men's
Finished installation of Urinal plumbing






Work session @ Junior Sailing Saturday 28th June 10 o'clock (10:00)
Unloaded decking timber from lorry
Finish decking structural timber work for phase 1
Fitted deck timbers to phase 1
Fitted some handrail to decking
Removed old gutter and fascia from part of clubhouse front, fitted new fascia backing
Moved 'spare' timber and other materials from men's changing room
Grass cutting
Another coat of paint on timber work around urinals in men's
Removed some old cement then turf old steps area for portacabin
Weld up security grill
Made some 'polite' signs for changing rooms
Moved another load of soil and hardcore to DBP

Friday 27th June
Put the rest of handrail posts round phase 1 decking area
Dug/concrete last foundation pad for phase 1 decking



Tuesday 24th June
Continued construction of decking -
- Added front rails and an intermediate post for handrails,
- Add noggins on most of the joists
- Filled woodwork on panel for urinals
- Started the plumbing for urinals

Sunday 22nd June
Continued constructing decking beams and joists for first phase of decking
- all beams in place, most joists in place, some handrail posts fitted


Work session Saturday 21st
Good progress after a few initial hitches,
3 of the four planned bays of joists in place - you can just see them on lakecam (2) (pictures to follow)
Drainage vent stack replaced to allow cladding and be ready for installation of urinals
Undercoat applied to new area for urinals

Tuesday 17th June
Started on lady's shelves
Finished woodwork around men's urinals - now ready for painting


Work session at Junior Sailing Saturday 14th
Finished painting the race hut
Finished painting the security grills
Fixed wall plates for first stage of decking
Did some battening outside walls for cladding
Tidied up round moved portacabin
lots of grass cutting
and .........


Work session at Junior Sailing Saturday 7th June
Made pads for decking on Patio area (Cut hole, dig down, fill concrete *10)
Cut some grass
Cleaned the Race Hut (outside) and started painting it
Painted one of the security grills
Trimmed some trees



Tuesday 3rd June
Did some more work for the urinals


Workday Saturday 31st May thanks to all that attended
Spread new shingle (20t) in car park
Disconnect portacabin door links ready for large cabin to be moved
Sealed up link doorways on portacabins
Moved 3 boats to allow repositioning of large portacabin
Cleared out below large portacabin
Made pads for new position of large portacabin
Made shutter boxes for concrete pads
Made pads for decking (drilled holes with post hole borer , fill with concrete and rebar)
Battened the back wall of men's changing room ready for cladding
Trimd small trees in front of race hut (see results on lakecam I)
Cut grass around clubhouse etc.
Varnished shelves for lady's changing room
Rodded the drains!
Filled along back edge of mantle shelf
Changed screws in lady's shower pole base to stainless
Painted back door of men's changing room
Put plastic buttons on cubicle fixings
Tidied up patio area

Thursday 29th May
Bob tiled the piller in the men's changing room


Tuesday 27th May
Did some planning for Saturday
Asked intruders to leave site


Tuesday 20th May
Started work on Urinals
Hung shower curtain in Lady's
Fitted button for Projector screen

Wednesday 14th May
tidied up for Junior sailing on 17th!
Started plumbing in lady's showers
Started installation of mantle shelf in clubroom
Rubbed down and oiled new bar door

Tuesday 6th May
Preparatory work for installation of lady's showers
Measured up for some plumbing and ventilation materials

Friday 2nd May
Gloss paint on lady's change door and frame
More work on toilet cubicles (all doors on)
Painted round tiled panel in lady's

Wednesday 30rd April
More work on nstalling the toilet cubicles
Continued cleaning up and filling door frame on lady's changing room door
Undercoat on partition of men's toilets

Wednesday 23rd April
A little work on the toilet cubicles
More tiling in lady's shower (now grouted)
Some cleaning up and filling door frame on lady's changing room door
Undercoat on toilet divider in men's
Some filling done round tiled panel in lady's

Sunday 20th April
Connected hand dryer in lady's
cable trunking for thermostat in men's
wiring tidied up on bar door
Toilet roll holder fixed in mens cubicle

Friday 18th April
Continue install of toilet cubicles
access control completed on replacement Bar door


Wednesday 16th April
Started install of toilet cubicles
More tiling in lady's shower

Some filling and priming around ladies shower area


Wednesday 9nd April
Painted on architrave on disabled toilet door
More tiling in lady's shower
Installed and checked Emergency light in Lady's
Shelves for lady's assembled
Modesty panel for lady's shower area readied for tiling edges fitted and profiled, primed all bare wood
Some painting in Men's changing room


Friday 4th April Bob in the afternoon then Malcolm, Tony
Some more work on boxing in pipes in lady's
Tiled the back wall of lady's shower area
more work on bag shelf for lady's changing room
Fix brackets for mantle shelf
Modesty panel in men's painted
Door to men's changing room given a coat of gloss
Coat of pva on panel in lady's ready for tiling

Wednesday 2nd April Malcolm, Tim, Tony
More painting done
Started work bag shelf for lady's changing room
Some work on lady's shower area
Started to box in some of the pipework on lady's


Thursday 27th / Fri 28th March
Hooks fitted to new benches in lady's
Undercoated architrave on disabled toilet door
Another coat of terracotta on mantle shelf
Some more work done on modesty panel in lady's
Cubicle partition in men's primed
Rubbed down and painted back door to men's changing room
Another coat of undercoat ends of modesty panels in mens
Decided how to fit Emergency light in Lady's
Emergency lighting in Men's connected up and working


Wed 26th March
Two coats of varnish on new benches in lady's
Undercoated architrave on disabled toilet door
Another coat of terracotta on mantle shelf
Some more work done on modesty panel in lady's
Fitted PIR sensors in men's
Rubbed down and apply another coat of gloss new door on disabled toilet
Another coat of undercoat door on lady's changing room
Rub down and paint back door to men's changing room
Cleaned up and did more filling on door frame on lady's changing room door
Undercoated and filled ends of modesty panels in mens
Emergency lights fitted in mens

Wed 19th March
Rubbed down and varnished (first coat) new benches in lady's
Cut and fitted architrave on disabled toilet door
First coat of top coat on mantle shelf in terracotta
fitted end covers on panels in men's
Gloss new door on disabled toilet
Undercoat door on lady's changing room
Re-fixed base of RH heater in men's

Friday 14th March Malcolm, Tony
Last tiles ni men's shower grouted
Men's shower silicon sealant run at ceiling
First bench in lady's completed (well nearly)
Second bench in lady's to same state
....- just needs hook rail to be ready for rub down and varnish
Modesty panel in lady's -frame fixed in place - now needs bracing and cladding

Cleaned up, filled and primed door frame on men's changing room door


Wed 12th March Bob, Cliff, Stuart, David, Tim, Malcolm, Roger, Sue, Tony
Pulled through cable for thermostat in men's changing room
First gloss on new door on disabled toilet
Primed door on lady's changing room
More undercoat on modesty panel in men's
Fitted rest of light fittings in lady's
Started making new benches for lady's changing room
Insulated pipes above mens toilet cubicles
Closed some ducting in lady's
Labeled mail shot
More Tiling in men's showers

Friday 7th March Malcolm and Cliff assisted and:
Grouted tiles in men's shower
Put closer and handle on door to lady's
Did some cleaning up and put remains of old flooring into bin
Did some more work on end partition of mens Cubicles

Thursday 6th March Bob spent some time at the club and:
Put undercoat on new door on disabled toilet
Rubbed down and varnishing last new bench in men's changing room
Painted ceiling in men's shower area
Put second coat of emulsion on end wall of men's

Wed 5th March Stuart, Colin, Malcolm, Ian, David, David, David, Tim, Tony, Tony, Cliff, Roger and Sue
Finished install of toilets, plumbing in and test
More work done on partition for end of men's cubicles
Fitted new door on lady's changing room
Done more work on modesty panel in men's

Modified and fitted last door on kitchen units
First new light fitting installed in lady's
Tiled extended area of men's
Temporary 'screens' erected around toilets
Fitted additional shelf in cupboard under urn


Sat 1st March Roger, Stuart, Colin, Wally, Andrew, Adam, David, David, Paul and Tony
The floor laying was completed by John the floor layer
Put a coat of paint on the walls in the cleaners cupboard and clubroom cupboard
Painted the ceiling in the men's shower
Stuffed the renewal letters into envelopes
Painted the end wall in the men's changing room
Cleaned and replace cooker in Galley
Put dishwasher and fridge back in galley
Moved some tables and chairs back into clubroom
Ran pipework for new cisterns in mens
Ran pipework for new cisterns in lady's
Started installing toilets, found problem with fill rate
Put up first part of partition for end of men's cubicles
Put back doors in men's and old lobby
Put benches back in place in men's
Re-assembled central benches in men's
Put Legs on L partition in men's
Put up modesty panel in men's still needs completion (pull through cable for thermostat and fit box)
Rubbed down and varnished last new benches in men's changing room (still needs last coat)
Completed fitting new door on disabled toilet
Some work on getting power boats back on the water
and ate a very good lunch cooked by Wally

Sun 24th February
Clubhouse was cleared ready for the new flooring to be laid
Moved fridge into Bar
Stacked short benches in shower area
Moved cooker and dishwasher int old entrance loby
Old floor taken up in clubroom
Finished painting wall and partition at far end of men's changing room
Painted new plasterwork in lady's
Painted ceiling and new cubicle walls in men's
Started construction of frame for end of cubicles in men's
Undercoated mantle shelf
Started battening outside walls for cladding

Sat 23rd Feb
Access control for Bar installed
More prep for floor laying done

Fri 22nd Feb
Radio aerial installed
More network cabling finished
Cable run for Bar access control
Some changes made to plumbing for new toilet arrangements

Wed 20th February 6pm onwards
Fixed new light fittings in men's
Painted first coat on new plasterwork in lady's
Painted ceiling and new cubicle walls in men's

Tuesday 19th February
Additional coat of paint on men's ceiling and walls

Sun 17th February
Skimmed new plasterboard in lady's
Started constructing modesty panel for mens
Completed base timberwork for new benches in lady's
First coat of paint on ceiling in men's
Repaired insulation in roof from breakin
Fitted Cabin Hook on fire exit door
Mounted new shower heads in men's showers
Fitted trim strip to remaining joint in galley wall lining
Investigated external vent pipe adjacent men's change decide modifications to enable cladding
Undercoated mantle shelf
Did some tidying/clearing up
Squared of ends of central bench in men's
Ran cables for new light fittings in men's
Repaired loose patch of floor screed in men's
Fixed battening on wall in lady's shower, insulate, fixed Aquapanel
Removed door of lady's changing room
Lots of tidying up of cable runs

Fri / Sat 15th 16th Feb
Chased out for wiring in lady's changingroom
Battened and lined wall in lady's
Plasterboarded new partition in Lady's
Extended step in entrance to men's changingroom
Fitted new light switch in lady's



Wed 13th February
Skimmed plasterboard behind men's toilets
PVA applied to ceiling in men's
Fitted new drain in lady's shower area
Completed wiring for network link to Drott Shed
Mounted access control unit for Bar
Fitted soft close stops on galley cupboards
Primed mantle shelf
Constructed stud work for edge of lady's shower area
Taken up remaining floor covering in lady's
Set floor gulleys in men's
Started running cables for new light fittings in Men's
Tidied up wiring above fuse cupboard

Sun 10th Feb
Dry lined wall in Mens next to toilets
Removed vinyl floor cover in in men's and most of lady's
Removed hand dryer and electric heating from lady's
Completed surround for new lady's shower area
Made good wall outside lady's
Removed some old tiles from men's shower area

Sat 9th February
Modified pipework above toilet area in men's
Built stud work behind toilets in men's - and fixed plasterboard
Plasterboarded stud work in lady's
Removed basins in Ladies to allow work
Cut back concrete ready to fit new drain in lady's shower area
Dug out old floor drains in men's
Set up Temporary toilet facilities
Removed collars from soil pipes in mens change
Removed vent pipe in lady's and modify pipework - made good wall inside

Wed 6th February afternoon/evening
Finished wiring for trace heating on water heater
Removed lights in men's changing room
Fitted some stud work in lady's changing room
Leveled floor in mens change ready for floor laying
Primed disabled toilet door
Primed some timber work in clubroom
Added more timber to cupboard area in clubroom
Sorted materials order list for weekend work
Fitted remaining trays in cup cupboard


Sun 3rd February
Fitted hooks on finished new benches in men's
Removed benches from lady's
Started to set up Temporary toilet facilities
Removed toilets from lady's
Fitted weather rail on lakeside doors
Completed install of last bench in mens changing room
Started to fit new door on disabled toilet

Thur 31st January
More paint put on wall of men's
Outside tap remounted

Wed 30th January (evening)
Sorted out the dishwasher!
Some planning for the workdays.
Removed toilet cubicles from men's changing room
Completed temporary light in old entrance lobby

Tue 29th January
Continued rubbing down and varnishing new benches in men's changing room
Continued painting new plaster in men's changing room

Wed 16th January
First coat of emulsion on new plasterwork in men's
Rubbed down last benches
Chopped in cable runs and backing box for some electrics in men's
Planning for new cupboards in clubroom

Tuesday 15th January
Malcolm cut back shower area in men's changing room

Wed 9th January
Finished wiring for trace heating on water pipes in roof over men's changing room
Continued with installation of new benches in mens changing room
Removed a section of wall adjacent to showers in men's
Caught and ejected a mouse
Tidied up the inside of the cupboard in the clubroom

Tues 8th January
Bob put a first coat of varnish on the last benches in the men's

Thursday 3rd January
Paul and Malcolm dry lined and skimmed the rebuilt partition
and the wall adjacent to the office in the men's changing room

Wed 2nd January
Made temporary repair to race hut window
Rebuilt partition by fire exit in men's changing room


Wed 12th December
Removed the last of the old benches from the men's changing room
Made the last two sections of benches for men's changing room

Wed 5th December
Tasks available:
Started wiring for trace heating
Removed some more of the old benches in Men's changing room
Built another section of new bench in men's changing room
Rubbed down and start varnishing another of the new benches in men's changing room
More filling and finishing of the door frame of mens changing room door

Wed 28th November
Built another section of bench in men's changing room
Modified central bench in men's to allow floor to be fitted
More filling around new door to Men's changin room

Wed 21st November (evening)
Rubbed down and start varnishing new benches in men's changing room
Continued painting door to men's changing room
Made bracket for projector screen
Bob finished the benches on Thursday and Friday

Wed 14th November (evening)
Finish insulated more water pipes
Fitted Cabin Hook on mens change door
Continue building more sections of benches in men's changing room
Made good wall in men's changing room
Malcolm has filled in some of the holes in the floor
Bob did some more work on the Store cupboard in lady's changing room during the week

Wed 7th November (evening)
Fitted out modified Cupboard in Galley
Started work on next benches in Men's
Some of the holes filled in the men's changing room floor

Tues 6th November
Bob spent a few hours in the afternoon and
Primed the new door to Mens changing room
Cleaned up, filled and primed the door frame of Men's changing room door.


Wed 31st October (evening)
Wired up temporary external light by lakeside door
Fixed hooks to new bench in Men's changing room
More work carried out on electrics
Added shelf in main cupboard in Clubroom

Wed 24th October (evening)
Fixed bases for new benches in men's (cut timber, fix to wall)
Cleaned tiles in Men's shower - decision keep and re-grout
Fixed some wiring in ceiling of main room in preparation for link to Drott shed
Discussed detail of cladding and did some planning of cupboards in main room
Bob has been varnishing the new benches

Wed 17th October (evening)
Extended hearth (completed Friday)
Fill bottom of walls in clubroom
Started wiring up external lighting control
Removed ceiling in old entrance lobby
Replace broken up-lighter


Wed 30th May (Evening)
Completed installation of access control for clubhouse
Mounted fire blanket in Galley
Insulated new plumbing in men's
Finished off around wash basins in men's

Wed 24th May (Evening)
Worktop for wash hand basins replaced in ladies,
External reader mounted, wired up and tested for club house access control
Tiled round mens wash basins

Saturday 19th May - Junior Sailing
Men's toilets cleaned up and a coat of emulsion
Pipes lagged in men's.
Wood store tidied and extension built
Internal reader for access control to clubhouse connected and tested

Work session Wed 17th May (Evening)
Another coat of emulsion on the walls in the men's
Tile round new wash basins in men's
Access control unit mounted and power supply connected
Door release mechanism connected and tested

Sat 12th May
Installed wash hand basins in men's changing room (cut through walls for pipe runs etc)
Fitted a urinal temporarily in men's
Removed both of the old wash hand basins in the men's
fitted new escutcheons on lakeside door lock

Wed 9th May
Started work on new wash hand basins in men's changing room
Shutter now working on Patio door
More painting done including first coat on new plaster work in men's
Cleaned up and primed cover over beam cross galley


Sat 5th May
Plastered remaining areas of dry lining in men's changing room
Ran electrical supply for access control/alarm
Mounted access control unit for lakeside door
Connected up flood light on car park side of clubhouse


Note - no session Friday 4th May due to training course

Wed 2nd May
First thinned coats of emulsion on plastered wall in men's changing room
Finished lining walls in galley
Fit Latch in cupboard door in lady's changing room
Primed outside of door in lady's changing room.
Pulled through cables for egress lights (men's change back door and office door)
Made and mount backing board for new notice board by phone (one of the old notice boards fixed in place).


Saturday 28th April
Installed down lighters over phone/noticeboard
Finished battening and lining men's changing room
Fixed vents/flaps on outside for Lady's extractor
Plastered area in Men's where new wash hand basins will go

Friday 27th April (Evening)

Wednesday 25th April (Evening)
started install down lighters over phone/noticeboard
Finished fixing the third extractor in the galley
Cut in backing box for fridge supply
Continued battening and lining men's changing room
Did some more painting round the clubroom
Fixed vents/flaps on outside of galley extractors

Friday 20th April (evening)
Clubhouse is readied for topper open
Installed 3rd extractor hood in galley

Thursday 19th April
More painting

Wed 18th April (Evening)
Painted undercoat on beam between bar area and main area
Descaled shower heads men's change
Painted wall adjacent to bar
Fixed plinth for heater in main room and move heater from Drott shed
Cut in electrical boxes for up lights, Fixed uplights
Continued battening and lining men's changing room

Sat 14th April
More battening in men's

Fri 13th April (Evening)
Made sure the club is fit to welcome visitors for the Champion Club event on Sat 14th
Lakeside door lock sorted (mostly)
Key box fixed to wall
First aid box fixed to wall
Fixed door closer on lady's change door
Fixed door closer on Lakeside door
Main light switch panel wired up
Tideied wood store



Wed 11th April (Evening)
Cooker installed
Commission galley extractor hoods
Fitted door furniture on new fire exit door
Did more electrical installation
Continue battening and lining men's changing room


Friday 6th April
More painting done to walls in clubroom
More painting done on outside doors
Installed Dish Washer
Started install of third camera
Completed installation of extractor fan in lady's changing room
Moved phone
Routed cables for access control
Connected door release for lakeside door
Did some clearing up
Commissioned new urn

Wed 4th April (Evening)
Continued battening men�s changing room
Did more Painting walls in clubroom
Did more paint on outside doors
Did more electrical installation
Did more work on the Galley
Mounted microwave on wall in galley
Tested new urn (found that the filer hose leaked)
Met with MD of Gas Installation Company to discuss work
Fettled fit of lakeside door


Sat 31st
Plastered around phone position, and alongside bar and anything left from the list below
Continued battening men�s changing room and put up some plasterboard
More Painting walls in clubroom
More paint on outside doors
Conmpleted new doorway and stud wall for disabled toilet (woodwork)
Wiring for speakers and network connections carried out
More work in the galley completed

Wed 28th March (Evening)
Insulated remaining pipes in lady's changing room
Continued battening men�s changing room
Painted walls in clubroom
Did more electrical installation




Fri 23rd(eve) Sat 22nd March
Rubbed down and paint doors (next coat)
Wall either side of Chimney breast painted
Made good threshold on new fire doorway
Made good walls in men's changing room ready for battening
Continued work in Galley
Started new doorway and stud wall for disabled toilet
Completed plasterboard on wall by phone

Wednesday(Eve) 21st
Rubbed down and painted doors
Made good thresholds of lakeside door
Started battening men�s changing room
Continued work in Galley
Hand dryer in Lady's changing room connected up
Box mounted for thermostat in Lady's changingroom
Started new door frame for new doorway for disabled toilet
Put undercoat on L wall in men's changing room
Grouted tiles in bar


Friday 16th (Afternoon/Evening) Saturday 17th
Rubbed down and painted doors
Insulated some pipes in lady's changing room
Fixed remaining lights to ceiling
Tiled lady�s splashback and bar splashback
Moved sockets in bar
Made improvements to HW plumbing
Plumbed in waste for new urn
Fitted cupboard shelves under three sinks
Battened area near phone and cleaned up and moved phone
Continued work in Galley

Thursday 15th
Malcolm has done a posh job on the Chimney breast
Rendered some of the old window areas in the men's

Wednesday 14th (Evening)
Cut in many of the electrical boxes to walls
Started wiring sockets etc in clubroom
Paint L shapped divider in Men's changing room
Added plumbing for dish washer
Wired in outlets for heaters and hand dryer in Men's
Fixed outlets for heater and hand dryer in Lady's
Planned tea/coffee making area

Sat 10th March
Refixed frame of Lady's changing room door
Remaining plasterboard fixed
Walls Plastered
Small central wall in men's changing room cut back
Latch for lakeside door fitted
New heater fixed to wall in lady�s changing room
Primed inner face of L shapped divider in Men's changing room

Fri 9th March (evening)
More electrical work done including power to the boiler
Sinks fitted in the galley
Preparation for plastering
Started fitting lock / latch to main door
The gas is on and we have heating in the gents and instant hot water throughout
Sinks in galley plumbed in
Another Screwfix order is being put together...

Wed 7th March (evening)
New extractor fan in lady's changing room partly installed.
More electrical installation completed
Anti-scale device fitted to mains water
Boxing to plumbing modified and refitted in office
Network cables tidied up in office
Pulled cable through to form new lighting feed to men�s changing room
More of the plasterboard fixed including the pads for fire extinguishers
Hand dryer fixed to wall in Lady's changing room
Lady's changing room tidied up

Sat 3rd Mar
The ceiling was plastered and lights fitted
Wall each side of fireplace plastered
Staging removed
New wash basins in Lady's changing room fitted
Tank connected for feed to cisterns
Kitchen fitting progressing well
Tidied up for Sunday - inside and out
Trace heating wire pulled through
Temporary enclosure round electrics

2nd March
Kitchen install started

1st/2nd March
Gas heater installation started - slow progress

28th Feb (evening)
More of the plasterboard fitted
Lakeside door hung
More electrical installation completed
More battening fitted in the kitchen
Plumbing ready for gas install and commisioning

Wed 28th
New windows fitted to men's changing room

Sun 26th General workday
Lakeside door cut to size and edged, painted on one side
Fire door fitted, hung and first coat of paint applied
Some of the last bits of dry lining installed.
More electrical cabling installed including run for trace heating
Temporary steps installed for patio door and lakeside door
More battening in place around fire door and some in galley
Much of the old benches removed from men's changing room
Some old timber cut up for firewood
Rubbish put in skip
Building blocks moved

Sat 25th Feb
Main room dry lining nearly completed plastering next Saturday
Complete construction of platform for CW tank (timber work)
Water heater mounted and much of the plumbing for it in place

Thursday 22nd/ Friday 23rd Holes cut for new fire exit door and new windows in men's changing room.

Wed 21st Feb (evening)
Batten East wall for plasterboard (drill plug wall screw batten to wall).
Continued the installation of cable runs in main room area
Marked positions of new windows on wall of men's changing room.
Install new extractor in lady�s changing room
Battened north wall to left of fireplace ready for plasterboard

Monday 19th
The patio door and window were fitted

Sunday 18th Feb
Holes for sink wastes in Lady's changing room cut.
Old extractor hole fully closed and a number of other old holes made good.
More of the joist in the roof in place (nearly all done now).
More of the cabling in place.
Tank support structure in place, just needs a 'floor'.
Cable ducting for distribution panel in place.
Cut hole in wall for tank overflow.

Thanks to Alison, Brian, Robin, Tim, Tony, and Tony. David was working on the committee boat, we saw him when the soup was served!

17th Feb First day of work after the new holes cut in the wall! a bit cool. lots of dust from the disk cutter we will have to do some serious cleaning up soon. Good progress today:
Holes cut in wall for extractors and waste pipes in galley
New main door frame fitted
Insulation in roof now completed
Roof joists fitted to lakeside, only galley side to do
Support for new water tank started
Lots more of the plumbing in place
Frame to support cooker hood started.
Cavity closers fitted to new openings.
Base of opening for patio door cleaned up.
More of the old wood cut up for the fire.

Thanks to those who helped today (Dan, Cliff, Colin, James, Malcolm, Mike, Paul, Ron, Simon, Stephen and Stuart)

16th Feb Day 2 of the building work Eddie cut hole for new window and modified the lakeside door opening for new door. Had a 07:45 meeting with heating engineers about installation of gas space and water heaters. David W making and fixing plates to mount main lights on. Cliff did more plumbing.

15th Feb Builder (Eddie) started work on modifications to lakeside wall for new windows and doors. Cliff worked on plumbing and David W ran some cabling.

14th Feb Lower insulation installed on east side, holes drilled for some of the pipe runs. Window positions marked and mixer found and started.


10th/11th Feb
The final roof tie is in place and wall plates on north wall to support ceiling joists. Small holes in roof sealed. Centre ceiling joists in place and centre runs of roof insulation fitted. Ventilation holes for roof space have been cut. Airbrick in fireplace finished. Fix wall plate for cold-water tank support. Old extractor fan hole on wall bricked up.

7th February All but one of the roof ties are now in place. Extractor removed from galley, tiles removed from lady's changing room. More of the re-cabling completed. Floor in old cleaners cupboard filled.

4th February First planned Refurbishment work session. Following the success of the workday on the 3rd the remains of the clubroom and galley have been stripped out and the first two of the new ties have been put in place in the roof. Much of the old timber that was taken out has been cut up and put in the wood store for burning on the wood burner. More work on the construction of new steps to the portacabin was completed.

3rd February Good progress made at the workday, clubroom cleared, low ceiling, tanks and wall removed. Part of main ceiling cladding also removed.

28th January New windows ordered.

17th January Building control approval received!!!! Strip out of galley and tanks etc planned for 4th Feb