Forum Home | Profile | Active Topics | Members | Search | FAQ
Username:  Password: 
Save Password
Forgot your Password?
 All Forums
 GMSC Administration
 Work Day Planning
 Workday Saturday 27th March

Note: You must be registered in order to post a reply.

Screensize:
UserName:
Password:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkInsert EmailInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

  Check here to include your profile signature.
Check here to subscribe to this topic.
    

T O P I C    R E V I E W
TonyGreen Posted - 07/03/2010 : 21:10:00
Workday Saturday 27th March

Start 10:00

Food for the workers

Bring some tools!


Thanks to all that helped
New concrete slope for mirror jetty laid
New concrete for wash-up laid
Finished building brickwork for new BBQ
BGSC container moved
Many turfs picked up on camping area
Hedge trimmed
Fence repaired by bridge
Some "stuff" cleared from porta-cabin
Weather station install started
Moved old tables from Bar container
Moved fridge into Bar container


IMPORTANT

  • Lunch

  • Lunchtime BAR

Clubhouse and Grounds etc

  • Shutter and lay new concrete slope by mirror jetty!

  • Reposition second ISO container by drott shed

  • Move large items from Workshop to ISO store

  • Replace breaker in bar container fuse panel with 16A mcb

  • Tidying up tasks on improved camping area (depends on condition)

  • move old tables from bar container to new tool store then fridge from old entrance to bar container

  • Cut down dead trees on boundary towards bridge

  • Repair fence towards bridge

  • Move large items from Drott shed to ISO store

  • Install weather station

  • shutter and lay concrete for external wash-up sinks

  • Replace gutter on West side of Drott shed

  • General tidying up round clubhouse

  • Put cupboard on wall in workshop for network gear

  • paint base under heater in men's

  • Box in round pipes to heaters in changing rooms

  • Work on new picnic table

  • Fit Kensington lock to projector

  • Run pipe work for rainwater collection

  • Clean office door

  • Tidy workshop, patch ceiling, hooks for tools,

  • Improvements in cleaners cupboard - making space for pump

  • Fix conduit run through drott shed

  • Tidy round berths

  • Shelf above bar

  • finish brick bbq in camp area

  • Continue boxing of pipe work and ducting in lady's

  • Continue cladding pipe work in men's cut board and fix

  • Repair runner fixing on clubroom cupboard door

  • Pollard willows near mirror jetty (move timber to bonfire or wood store)

  • Plug holes in Drott shed roof

  • Replace door to workshop


Boats etc.

  • Improve ramp onto working pontoon

  • Remove chicken mesh from hinged launch ramp.

  • Fix large cleat to shore by fuel store.

  • Pump out all pontoons.

  • Improve concrete around main slip (in water)

  • Check buoys for wear on tackle.

  • Trim chains on pontoon.

  • Replace tyres on jetty where required

  • Replace hatch with plate on pontoon

  • Work on new ramp for mirror jetty




Contact premises@greatmoor.org.uk

Sailing News Tickertapeby News Ticker by Sailweb 
Wind Chart
by theyr.net
Snitz Forums 2000