Posted - 07/03/2010 : 21:10:00 Workday Saturday 27th March
Start 10:00
Food for the workers
Bring some tools!
Thanks to all that helped New concrete slope for mirror jetty laid New concrete for wash-up laid Finished building brickwork for new BBQ BGSC container moved Many turfs picked up on camping area Hedge trimmed Fence repaired by bridge Some "stuff" cleared from porta-cabin Weather station install started Moved old tables from Bar container Moved fridge into Bar container
IMPORTANT Clubhouse and Grounds etc
- Shutter and lay new concrete slope by mirror jetty!
- Reposition second ISO container by drott shed
- Move large items from Workshop to ISO store
- Replace breaker in bar container fuse panel with 16A mcb
- Tidying up tasks on improved camping area (depends on condition)
- move old tables from bar container to new tool store then fridge from old entrance to bar container
- Cut down dead trees on boundary towards bridge
- Repair fence towards bridge
- Move large items from Drott shed to ISO store
- Install weather station
- shutter and lay concrete for external wash-up sinks
- Replace gutter on West side of Drott shed
- General tidying up round clubhouse
- Put cupboard on wall in workshop for network gear
- paint base under heater in men's
- Box in round pipes to heaters in changing rooms
- Work on new picnic table
- Fit Kensington lock to projector
- Run pipe work for rainwater collection
- Clean office door
- Tidy workshop, patch ceiling, hooks for tools,
- Improvements in cleaners cupboard - making space for pump
- Fix conduit run through drott shed
- Tidy round berths
- Shelf above bar
- finish brick bbq in camp area
- Continue boxing of pipe work and ducting in lady's
- Continue cladding pipe work in men's cut board and fix
- Repair runner fixing on clubroom cupboard door
- Pollard willows near mirror jetty (move timber to bonfire or wood store)
- Plug holes in Drott shed roof
- Replace door to workshop
Boats etc.
- Improve ramp onto working pontoon
- Remove chicken mesh from hinged launch ramp.
- Fix large cleat to shore by fuel store.
- Pump out all pontoons.
- Improve concrete around main slip (in water)
- Check buoys for wear on tackle.
- Trim chains on pontoon.
- Replace tyres on jetty where required
- Replace hatch with plate on pontoon
- Work on new ramp for mirror jetty