Forum Home | Profile | Active Topics | Members | Search | FAQ
Username:  Password: 
Save Password
Forgot your Password?
 All Forums
 GMSC Administration
 Work Day Planning
 Workday Saturday 27th March
 New Topic  Reply to Topic
 Printer Friendly
Author  Topic Next Topic  

TonyGreen

United Kingdom
57 Posts

Posted - 07/03/2010 :  21:10:00  Show Profile  Visit TonyGreen's Homepage  Reply with Quote
Workday Saturday 27th March

Start 10:00

Food for the workers

Bring some tools!


Thanks to all that helped
New concrete slope for mirror jetty laid
New concrete for wash-up laid
Finished building brickwork for new BBQ
BGSC container moved
Many turfs picked up on camping area
Hedge trimmed
Fence repaired by bridge
Some "stuff" cleared from porta-cabin
Weather station install started
Moved old tables from Bar container
Moved fridge into Bar container


IMPORTANT

  • Lunch

  • Lunchtime BAR

Clubhouse and Grounds etc

  • Shutter and lay new concrete slope by mirror jetty!

  • Reposition second ISO container by drott shed

  • Move large items from Workshop to ISO store

  • Replace breaker in bar container fuse panel with 16A mcb

  • Tidying up tasks on improved camping area (depends on condition)

  • move old tables from bar container to new tool store then fridge from old entrance to bar container

  • Cut down dead trees on boundary towards bridge

  • Repair fence towards bridge

  • Move large items from Drott shed to ISO store

  • Install weather station

  • shutter and lay concrete for external wash-up sinks

  • Replace gutter on West side of Drott shed

  • General tidying up round clubhouse

  • Put cupboard on wall in workshop for network gear

  • paint base under heater in men's

  • Box in round pipes to heaters in changing rooms

  • Work on new picnic table

  • Fit Kensington lock to projector

  • Run pipe work for rainwater collection

  • Clean office door

  • Tidy workshop, patch ceiling, hooks for tools,

  • Improvements in cleaners cupboard - making space for pump

  • Fix conduit run through drott shed

  • Tidy round berths

  • Shelf above bar

  • finish brick bbq in camp area

  • Continue boxing of pipe work and ducting in lady's

  • Continue cladding pipe work in men's cut board and fix

  • Repair runner fixing on clubroom cupboard door

  • Pollard willows near mirror jetty (move timber to bonfire or wood store)

  • Plug holes in Drott shed roof

  • Replace door to workshop


Boats etc.

  • Improve ramp onto working pontoon

  • Remove chicken mesh from hinged launch ramp.

  • Fix large cleat to shore by fuel store.

  • Pump out all pontoons.

  • Improve concrete around main slip (in water)

  • Check buoys for wear on tackle.

  • Trim chains on pontoon.

  • Replace tyres on jetty where required

  • Replace hatch with plate on pontoon

  • Work on new ramp for mirror jetty




Contact premises@greatmoor.org.uk

Tony

Edited by - TonyGreen on 30/03/2010 18:16:07
   Topic Next Topic  
 New Topic  Reply to Topic
 Printer Friendly
Jump To:
Sailing News Tickertapeby News Ticker by Sailweb 
Wind Chart
by theyr.net
Snitz Forums 2000